Skip to main content
Calcimator

Dust Control Calculator

Water application rate for construction site dust suppression.

Inputs

%

Results

Daily water needed (gal)

16,940

Water per application (gal)4,235
Applications per day4
Wind adjustment factor1.69
Target soil moisture (%)5
Water truck loads/day5
Monthly water cost ($)$1,863.42
How to Use This Calculator
  1. Enter Area to suppress (yd²), Wind speed (mph), and Temperature (°F).
  2. Set Relative humidity (%).
  3. Review the Daily water needed (gal) result.
  4. Use Water per application (gal) and Applications per day to inform your decision.
Ad Placeholder
Ad Placeholder