Skip to main content
Calcimator

Traffic Signal Timing Calculator

Calculate signal green time, effective green, volume-to-capacity ratio, and average delay per vehicle for signalized intersections.

Inputs

veh/hr
veh/hr/lane
sec
sec
sec

Results

Green Time per Phase

39 sec

Volume/Capacity (v/c)

0.98

Effective Green41 sec
Delay per Vehicle24 sec
Approach Capacity820 veh/hr
Total Lost Time12 sec
How to Use This Calculator
  1. Enter approach volumes, saturation flow rates, and lost time per phase.
  2. Set number of phases and peak hour factor.
  3. Review cycle length, green time per phase, and level of service (v/c ratio).
  4. Target v/c ratios below 0.90 for acceptable intersection operation.
Ad Placeholder

Related Calculators

Ad Placeholder