Skip to main content
Calcimator

Stability Testing Schedule Calculator

Accelerated and real-time stability test design.

Inputs

Results

Acceleration factor (×)

2.83

Accelerated test duration (months)

8.5

Estimated shelf life (months)24
Real-time pull points9
Accelerated pull points5
Storage conditions3
Total pull points16
Total samples needed48
Total tests to perform288
Study duration (months)24
How to Use This Calculator
  1. Enter the product launch date or first batch date.
  2. Set required stability study conditions (ICH Zone I, II, III, IV) for your target markets.
  3. Input planned testing intervals (0, 3, 6, 12, 18, 24 months).
  4. Review the complete testing schedule with dates for each condition and interval.
  5. Use the calendar to book testing lab capacity and schedule product release decisions.
Ad Placeholder
Ad Placeholder