Mining Farm Design Calculator

Size electrical, cooling, and space requirements for a mining farm buildout.

Inputs

Results

Total IT power (kW)

325

Total facility power (kW)

406.25

Cooling power (kW)81.25
Transformer capacity (kVA)451
Total facility size (sq ft)1,166
Cooling required (tons)92.4
Heat output (BTU/hr)1,108,900
Airflow required (CFM)48,750
Electrical panels needed4
Total It Power Mw0.33
How to Use This Calculator
  1. Enter the target total hashrate and hardware model hashrate per unit.
  2. Set the power consumption per rig and facility power capacity in kW.
  3. Input cooling system type and PUE target.
  4. Review the total rigs that can be deployed, total power draw, and cooling requirements.
  5. Use the capacity analysis to plan electrical infrastructure and rack layout.