Data Center TCO Calculator
Total cost of ownership from build cost, electricity, staffing, maintenance, and connectivity over a multi-year horizon.
Inputs
%
Results
Total TCO ($)
$23,770,000
Total CapEx ($)$6,000,000
Total OpEx ($)$17,770,000
Annual OpEx ($)$1,777,000
Annual electricity ($)$657,000
TCO per kW/month ($)$396.17
Electricity % of TCO27.6%
CapEx % of TCO25.2%
How to Use This Calculator
- Enter the data center size in kW IT load and PUE.
- Set capital costs: land, construction, and IT equipment.
- Input annual power cost per kWh and staffing cost.
- Set the analysis period in years.
- Review total cost of ownership (TCO) and cost per kW per year to compare build vs. colocation options.
Ad Placeholder
Related Calculators
Data Center Power Budget Calculator
Calculate total facility power, energy costs, and overhead breakdown from IT load and PUE.
Cooling Capacity Calculator
Calculate cooling requirements from IT load, PUE, and airflow parameters for data center HVAC design.
UPS Sizing (Data Center) Calculator
Size UPS modules and battery banks for data center backup power with redundancy and runtime requirements.
Generator Sizing (DC) Calculator
Size standby generators for data center backup power with altitude/temperature derating and redundancy configurations.
Ad Placeholder