Data Center TCO Calculator

Total cost of ownership from build cost, electricity, staffing, maintenance, and connectivity over a multi-year horizon.

Inputs

%

Results

Total TCO ($)

$23,770,000

Total CapEx ($)$6,000,000
Total OpEx ($)$17,770,000
Annual OpEx ($)$1,777,000
Annual electricity ($)$657,000
TCO per kW/month ($)$396.17
Electricity % of TCO27.6%
CapEx % of TCO25.2%
How to Use This Calculator
  1. Enter the data center size in kW IT load and PUE.
  2. Set capital costs: land, construction, and IT equipment.
  3. Input annual power cost per kWh and staffing cost.
  4. Set the analysis period in years.
  5. Review total cost of ownership (TCO) and cost per kW per year to compare build vs. colocation options.