Skip to main content
Calcimator

Grading & Slope Calculator

Calculate cut/fill quantities, slope percentages, slope ratios, and grade break locations for site grading projects.

Inputs

ft
ft
ft
%

Results

Cut (-) / Fill (+)

2 ft

Actual Slope

2%

Slope Ratio (Run:Rise)50:1
Estimated Volume185.19 cu yd
Grade Break Distance100 ft
How to Use This Calculator
  1. Enter the Existing Elevation and Design Elevation at each end of the slope in feet.
  2. Set the Horizontal Run Distance in feet.
  3. Read Actual Slope (%) — compare against project specs (roads typically 1–5%, parking lots 1–2%).
  4. Check Cut (-) / Fill (+) to know whether material must be removed or imported.
  5. Use Estimated Volume in cu yd to budget earthmoving equipment and material costs.
Ad Placeholder

Related Calculators

Ad Placeholder