EIFS Calculator
EPS board, base coat, and finish for EIFS installation.
Inputs
%
Results
EPS boards (2×4 ft)
138
Finish coat (5-gal pails)
4
Wall R-value (EPS only)8
Mesh rolls (38"×150')3
Base coat (5-gal pails)6
Adhesive tubes40
EPS volume (cu ft)166.7
How to Use This Calculator
- Enter Net Wall Area in sq ft — the surface receiving the EIFS system after openings are deducted.
- Set EPS Thickness in inches for your required R-value (EPS provides R-4 per inch).
- Enter Mesh Overlap at seams (minimum 2.5 in per code) and number of Base Coat Layers.
- Set Waste Allowance (%) for field cuts around openings and corners.
- Review EPS Boards, Mesh Rolls, Base Coat Pails, Finish Coat Pails, and Adhesive Tubes for material takeoff.
Ad Placeholder
Ad Placeholder