Fault Detection Cost Calculator
FDD system cost and energy savings from fault correction.
Inputs
Results
First-year total cost ($)
$20,800.00
Net annual benefit ($)
$55,260.00
Simple payback (years)
0.4
Implementation cost ($)$14,800.00
Annual software ($)$1,000.00
Energy savings ($/yr)$28,000.00
Maintenance savings ($/yr)$12,000.00
Total savings ($/yr)$57,000.00
5-year ROI (%)927
Est. faults detected/yr170
How to Use This Calculator
- Enter Total BAS points, Number of AHUs, and Number of VAV boxes.
- Set Annual HVAC energy ($), Annual maintenance ($), and Building Age.
- Adjust New (0-5 years), Mid-age (5-15 years) as needed.
- Review First-year total cost ($) ($), Net annual benefit ($) ($), and Simple payback (years).
- Use Implementation cost ($) ($) and Annual software ($) ($) to inform your decision.
Ad Placeholder
Related Calculators
Energy Monitoring Budget Calculator
Submeter count and cost from monitoring requirements.
Commissioning Schedule Calculator
Cx timeline from point count and system complexity.
Setpoint Optimization Calculator
Energy savings from supply air temperature reset.
BAS Point Count Calculator
Building automation point count from equipment schedule.
Ad Placeholder