Skip to main content
Calcimator

Grading Cost Calculator

Estimate earthwork grading costs from cut/fill volumes and terrain characteristics.

Inputs

acres
ft
ft
% of site
$/CY
$/CY
% of net

Results

Total Grading Cost

$383,174

Cost per Acre

$38,317.4

Earthwork Cost$322,664
Hauling Cost$60,510
Cut Volume24,200 CY
Fill Volume16,133 CY
Total Earthwork40,333 CY
Cost per SF$0.88
How to Use This Calculator
  1. Enter Site Area in acres and Average Cut Depth and Fill Depth in feet.
  2. Set Cut Area % of site to define the cut/fill split.
  3. Enter Earthwork Cost per cubic yard (cut and fill operations) and Hauling Cost per cubic yard.
  4. Set Import/Export Volume % — material that must be hauled in or out rather than balanced on site.
  5. Review Total Grading Cost and Cost per Acre.
  6. Use these estimates in development pro formas for site preparation budgeting.
Ad Placeholder

Related Calculators

Ad Placeholder