Skip to main content
Calcimator

AGV Path Planning Calculator

Automated guided vehicle fleet sizing from throughput.

Inputs

Results

AGVs required

4

Trips/hr/AGV7.85
Trip time (sec)390
Fleet capacity (loads/hr)31.38
Charging spares1
How to Use This Calculator
  1. Enter the required loads/hr throughput — the number of material movements needed per hour.
  2. Set the average trip distance (ft) — the one-way travel distance per mission.
  3. Enter the AGV speed (ft/min) from the vehicle specification sheet.
  4. Input the load/unload time (sec) for each pick-and-place operation.
  5. Set utilization (0.5–0.95) accounting for charging, waiting, and path conflicts.
  6. Review AGVs required and Charging spares to size your fleet and charging infrastructure.
Ad Placeholder
Ad Placeholder