AGV Path Planning Calculator
Automated guided vehicle fleet sizing from throughput.
Inputs
Results
AGVs required
4
Trips/hr/AGV7.85
Trip time (sec)390
Fleet capacity (loads/hr)31.38
Charging spares1
How to Use This Calculator
- Enter the required loads/hr throughput — the number of material movements needed per hour.
- Set the average trip distance (ft) — the one-way travel distance per mission.
- Enter the AGV speed (ft/min) from the vehicle specification sheet.
- Input the load/unload time (sec) for each pick-and-place operation.
- Set utilization (0.5–0.95) accounting for charging, waiting, and path conflicts.
- Review AGVs required and Charging spares to size your fleet and charging infrastructure.
Ad Placeholder
Ad Placeholder