Fortification Calculator

Calculate material quantities, excavation volume, and labor hours for fighting positions and protective structures.

Inputs

Results

Estimated Completion Time

4.8 hrs

Sandbags Required

2,000

Sandbag Deficit0
Total Excavation24 m³
Total Man-Hours96 hrs
Spoil Weight38.4 tons
How to Use This Calculator
  1. Select position type: Hasty Fighting Position, Deliberate Fighting Position, Machine Gun Position, Vehicle Position, or Command Post.
  2. Enter the number of positions to construct.
  3. Select soil type (Sandy, Loam, or Clay) which affects digging time and material requirements.
  4. Review sandbag count, material weights, and labor hours needed for the position set.
  5. Use these figures to task engineer assets and pre-stage construction materials.