Grid Interconnection Cost Calculator
Estimate the cost of interconnecting a generation project to the grid.
Inputs
MW
miles
$
$/mile
Results
Total Interconnection Cost
$4,770,000.00
Cost per MW
$95,400.00
Transmission Line$2,500,000.00
Transformer Cost$1,250,000.00
Switchgear & Protection$750,000.00
How to Use This Calculator
- Enter Project Size, Distance to Substation, and Interconnection Voltage.
- Set 34.5 kV, 69 kV, and 138 kV.
- Adjust 230 kV, Study & Engineering Cost as needed.
- Review Total Interconnection Cost ($) and Cost per MW ($).
- Use Transmission Line ($) and Transformer Cost ($) to inform your decision.