Subsurface Drip Design Calculator
Design SDI lateral layout from crop spacing, emitter specs, and peak ET to determine tape length, flow rates, and run times.
Inputs
%
Results
Number of laterals
1,056
Application rate (in/hr)
0.32
Peak run time (hr/day)
1
Field width (ft)2,640
Total tape length (ft)1,393,920
Total tape (miles)264
Total emitters1,393,920
System flow rate (GPM)11,616
Meets capacity? (1=Yes)1
Total tape cost ($)$111,514
Tape cost per acre ($)$1,394
Est. wetted diameter (in)23
Lateral overlap (%)0
How to Use This Calculator
- Enter Field size (acres), Field length (ft), and Crop row spacing (in).
- Set Lateral spacing (in), Emitter spacing (in), and Emitter flow rate (GPH).
- Adjust Peak crop ET (in/day), Tape burial depth (in) as needed.
- Review Number of laterals, Application rate (in/hr), and Peak run time (hr/day).
- Use Field width (ft) and Total tape length (ft) to inform your decision.