Skip to main content
Calcimator

Subsurface Drip Design Calculator

Design SDI lateral layout from crop spacing, emitter specs, and peak ET to determine tape length, flow rates, and run times.

Inputs

%

Results

Number of laterals

1,056

Application rate (in/hr)

0.32

Peak run time (hr/day)

1

Field width (ft)2,640
Total tape length (ft)1,393,920
Total tape (miles)264
Total emitters1,393,920
System flow rate (GPM)11,616
Meets capacity? (1=Yes)1
Total tape cost ($)$111,514
Tape cost per acre ($)$1,394
Est. wetted diameter (in)23
Lateral overlap (%)0
How to Use This Calculator
  1. Enter Field size (acres), Field length (ft), and Crop row spacing (in).
  2. Set Lateral spacing (in), Emitter spacing (in), and Emitter flow rate (GPH).
  3. Adjust Peak crop ET (in/day), Tape burial depth (in) as needed.
  4. Review Number of laterals, Application rate (in/hr), and Peak run time (hr/day).
  5. Use Field width (ft) and Total tape length (ft) to inform your decision.
Ad Placeholder
Ad Placeholder