Remediation Timeline Calculator

Estimate total project duration from investigation through regulatory closeout by remediation technology.

Inputs

Results

Operation (months)

40

Total duration (months)

116

Total duration (years)

9.7

Investigation (months)9
RI/FS (months)13
Design & permitting (months)9
Construction (months)5
Closure monitoring (months)30
Regulatory closeout (months)10
Longest phase (months)40
How to Use This Calculator
  1. Enter site size in acres from the property survey or remedial investigation boundary.
  2. Rate contaminant complexity (1=simple petroleum, 5=mixed chlorinated solvents/metals).
  3. Select the remediation technology (pump-and-treat, soil excavation, in-situ, MNA, or thermal).
  4. Rate regulatory burden (1=low, 5=high state oversight) and select your state program.
  5. Review phase durations (investigation, RI/FS, design, construction, operations) and total project timeline.