Scaffold Erection Time Calculator

Labor hours from scaffold size and configuration.

Inputs

Results

Erection labor-hours

33.5

Total labor-hours (erect + dismantle)

55.3

Dismantle labor-hours21.8
Erection calendar days1
Dismantle calendar days0.7
Hours per frame (erection)0.84
How to Use This Calculator
  1. Enter the total number of frames, lifts (tiers), cross braces, and planks/decks.
  2. Set crew size (number of workers).
  3. Review erection labor hours and days based on standard production rates.
  4. Check dismantling hours (typically 60-70% of erection time) and total project labor hours.
  5. Add safety inspection time and material handling time to your crew scheduling plan.