Elevator Bank Configuration Calculator
Number of elevators from building height and population.
Inputs
%
Results
Elevators required
1
Up-peak interval (s)120
Round-trip time (s)120
Expected stops per trip7
5-min handling capacity32
5-min peak demand24
How to Use This Calculator
- Enter Building population, Number of floors, and Car capacity (persons).
- Set Handling capacity %, Car speed (m/s), and Floor-to-floor height (m).
- Review the Elevators required result.
- Use Up-peak interval (s) and Round-trip time (s) to inform your decision.
Ad Placeholder
Ad Placeholder