Sludge Volume Calculator
Estimate sludge production from water treatment including turbidity removal and chemical addition. Size lagoons and estimate disposal costs.
Inputs
MGD
NTU
mg/L
Results
Daily Solids Production
1,864 lbs/day
Daily Sludge Volume
22.4K gallons/day
Sludge as % of Plant Flow0.45%
Total Solids Produced44.7 mg/L
Estimated Raw TSS30 mg/L
Coagulant-Derived Solids13.2 mg/L
Thickened Volume (3%)7,450 gpd
Dewatered Cake (20%)5.5 yd³/day
Lagoon Size (180-day)1.54 acres
Annual Disposal Cost$17,009
How to Use This Calculator
- Enter Plant Flow Rate (MGD) and Raw Water Turbidity (NTU) from source water monitoring.
- Input Coagulant Dose (mg/L) from your current treatment practice or jar test results.
- Select Coagulant Type (alum, ferric chloride, PACl) — each produces a different sludge mass per mg/L dosed.
- Enter Sludge Solids Content (%) — thickened sludge is typically 2-5% solids before dewatering.
- Review Daily Solids Production (lbs/day) and Daily Sludge Volume (K gallons/day) to size lagoons or mechanical dewatering equipment.
- Check Sludge as % of Plant Flow to verify recovery and disposal volumes are consistent with permit conditions.
Ad Placeholder
Related Calculators
Coagulant Dosing Calculator
Calculate alum, ferric chloride, or PACl feed rates from jar test results. Estimate alkalinity consumption and sludge production.
Water Treatment Plant Sizing Calculator
Size a water treatment plant from population, per-capita demand, and peak factors. Estimate basin, filter, and clearwell dimensions.
Filtration Rate Calculator
Calculate filter area, media volume, and backwash requirements from flow rate and loading rate.
Backwash Water Calculator
Calculate filter backwash volume, frequency, and supply requirements for water treatment plant filter maintenance.
Ad Placeholder