Smoke detector, heat detector, and pull station count from floor plan per NFPA 72.

Inputs

Results

Total initiating devices

24

Smoke detectors20
Heat detectors0
Manual pull stations4
Horn/strobe devices6
SLC circuits needed1
Devices per floor12
Adj. smoke spacing (ft)30
How to Use This Calculator
  1. Enter the floor area per floor in square feet and the ceiling height in feet.
  2. Enter the number of floors and exit doors per floor — pull stations are required at each exit.
  3. Select the detector configuration: smoke only (1), smoke plus heat (2), or heat only (3).
  4. Enter total corridor length in feet for corridor-specific smoke detector placement.
  5. Read the total initiating device count, smoke detector and heat detector totals, pull stations, horn/strobe devices, and SLC circuit requirements.

How the result changes with Number of floors

Number of floorsTotal initiating devices
11132
36432
65780
901,080

What each input means

Floor area per floor (sq ft)
Total floor area per floor in square feet.
Ceiling height (ft)
Ceiling height affects smoke detector spacing per NFPA 72 Table 17.6.3.5.1.
Number of floors
Total number of floors in the building.
Exits per floor
Number of exit doors per floor (pull station at each).
Detector config (1-3)
1 = Smoke only, 2 = Smoke + Heat, 3 = Heat only.
Corridor length (ft)
Total corridor length for corridor-specific smoke detectors.

What each result means

Total initiating devices
Total smoke + heat detectors + pull stations for entire building.
Smoke detectors
Total smoke detectors including corridor units.
Heat detectors
Total heat detectors (if selected).
Manual pull stations
Pull stations at each exit per floor.
Horn/strobe devices
Notification appliance devices (horn/strobes) estimated.
SLC circuits needed
Signaling line circuits (max 159 addressable devices each).
Devices per floor
Total initiating devices on each floor.
Adj. smoke spacing (ft)
Smoke detector spacing adjusted for ceiling height.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Floor area per floor (sq ft) = 5000, Ceiling height (ft) = 10, Number of floors = 2, Exits per floor = 2 = 6 input(s) provided
  2. Calculate Total initiating devices
    Total initiating devices
    24 = 24
  3. Calculate Smoke detectors
    Smoke detectors
    20 = 20
  4. Calculate Heat detectors
    Heat detectors
    0 = 0

Engine last updated . Checked against 3 independently-derived tests how we verify calculators.

The questions that sit next to this one — chosen by subject, including calculators filed under a different category.

More in Construction & Building Trades.