Critical Path Method Calculator

Estimate project duration using Critical Path Method (CPM). Calculate critical path length, total float, and schedule compression potential.

Inputs

days

Results

Total Project Duration

60 days

Critical Path Length

60 days

Total Float0 days
Avg Float per Activity0 days
Crash Potential9 days
Sequential Duration125%
How to Use This Calculator
  1. Enter Total Activities, Avg Activity Duration, and Parallel Paths.
  2. Set Critical Activities.
  3. Review Total Project Duration (days) and Critical Path Length (days).
  4. Use Total Float (days) and Avg Float per Activity (days) to inform your decision.
  5. Use the chart to visualize the results and explore different scenarios by adjusting inputs.