Critical Path Method Calculator
Estimate project duration using Critical Path Method (CPM). Calculate critical path length, total float, and schedule compression potential.
Inputs
days
Results
Total Project Duration
60 days
Critical Path Length
60 days
Total Float0 days
Avg Float per Activity0 days
Crash Potential9 days
Sequential Duration125%
How to Use This Calculator
- Enter Total Activities, Avg Activity Duration, and Parallel Paths.
- Set Critical Activities.
- Review Total Project Duration (days) and Critical Path Length (days).
- Use Total Float (days) and Avg Float per Activity (days) to inform your decision.
- Use the chart to visualize the results and explore different scenarios by adjusting inputs.
Ad Placeholder
Related Calculators
Earned Value Management Calculator
Perform Earned Value analysis to track project cost and schedule performance. Calculate CPI, SPI, EAC, ETC, and variance metrics.
Construction Bid Calculator
Build a construction bid price from material, labor, equipment, overhead, and profit margin. See the full cost breakdown.
Liquidated Damages Calculator
Calculate liquidated damages for construction schedule delays. Apply daily LD rates with contractual cap limits.
Ad Placeholder