Inputs

%

Results

Pre-mix bags (50 lb)

17

Scratch coat bags4
Total material weight (lbs)821
Metal lath sheets6
Cement - site mix (lbs)143.8
Sand - site mix (lbs)215.6
Acrylic polymer (gal)4.8
Polypropylene fiber (lbs)4.8
Mixing water (gal)3.6
Pigment (lbs, 3% dose)4.3
Pre-mix material cost ($)$991.29
Site-mix material cost ($)$198.5
Material cost / sq ft ($)$9.91
How to Use This Calculator
  1. Enter the vertical or overhead surface area in sq ft and the application thickness in inches.
  2. Select the application mode: 1=thin overlay (1/8–1/4 in), 2=standard sculpted (1/2–1 in), 3=heavy carved rock or waterfall (1–3 in).
  3. Set a waste factor of 15% for vertical work — higher than flatwork due to sagging and overspray.
  4. For pre-mix approach, use Pre-mix Bags (50 lb) and Metal Lath Sheets for your material order.
  5. For site batching, refer to Cement (lbs), Sand (lbs), Acrylic Polymer (gal), and Polypropylene Fiber (lbs).
  6. Compare Pre-mix Material Cost versus Site-mix Material Cost to choose the most economical approach.
Ad Placeholder

Related Calculators

Ad Placeholder