Slip Form Calculator

Calculate slip form rate of rise, concrete volume per hour, and project duration.

Inputs

Results

Form exposure time (hrs)

4

Set time adequate (1=yes)1
Max safe rate (in/hr)12
Volume per hour (cy)2.96
Total volume (cy)296.3
Total slip time (hrs)100
Total slip time (days)4.2
Estimated jack count23
Set Time Safety Ratio1%
How to Use This Calculator
  1. Enter the Rate of Rise in inches/hour and Slip Form Height in feet for the assembly.
  2. Enter Wall Thickness, Structure Perimeter, Total Structure Height, and Concrete Initial Set time.
  3. Review Form Exposure Time and Max Safe Rate to confirm the rise rate allows proper concrete set.
  4. Check Volume Per Hour and Total Volume in cubic yards to schedule batching plant production.
  5. Use Total Slip Time in hours and days to plan crew rotation for continuous 24-hour operations.