Skip to main content
Calcimator

Cycle Time Calculator

Calculate total injection molding cycle time from fill, pack/hold, cooling, and mold open/close phases.

Inputs

sec
sec
sec
sec
sec
sec

Results

Total Cycle Time

27.5 sec

Cycles per Hour130.9
Cycles per 8-hr Shift1,047
Cooling % of Cycle54.5%
Dry Cycle Time6 sec
Machine Utilization78.2%
How to Use This Calculator
  1. Enter fill time (sec), pack/hold time (sec), and cooling time (sec) from your process data.
  2. Set mold open/close time, ejection time, and any robot handling delay.
  3. Review total cycle time (sec), cycles per hour, and cycles per 8-hour shift.
  4. Check the cooling-time percentage — if above 60%, focus optimization on cooling circuit design.
  5. Use cycles-per-shift to calculate daily production volume for capacity planning.
Ad Placeholder

Related Calculators

Ad Placeholder