Dip Coating Calculator
Calculate dip coating film thickness, paint consumption, and drain time for industrial immersion coating processes.
Inputs
Results
Dry film thickness (mils)
0.47
Daily paint usage (gal)
1.1
How to Use This Calculator
- Enter Withdrawal speed (in/min), Viscosity (cps), and Volume solids (%).
- Set Coating density (lb/gal), Part surface area (sq ft), and Tank volume (gal).
- Adjust Parts per hour as needed.
- Review Dry film thickness (mils) and Daily paint usage (gal).
- Use Wet film thickness (mils) and Paint per part (gal) to inform your decision.
How the result changes with Volume solids (%)
| Volume solids (%) | Dry film thickness (mils) | Daily paint usage (gal) |
|---|---|---|
| 19 | 0.2 | 1.1 |
| 42 | 0.44 | 1.1 |
| 69 | 0.71 | 1.1 |
| 91 | 0.93 | 1.1 |
What each input means
- Withdrawal speed (in/min)
- Speed at which parts are withdrawn from the coating bath.
- Viscosity (cps)
- Coating viscosity in centipoise.
- Volume solids (%)
- Volume solids percentage of the coating.
- Coating density (lb/gal)
- Weight of coating per gallon.
- Part surface area (sq ft)
- Surface area of each part.
- Tank volume (gal)
- Total tank volume in gallons.
- Parts per hour
- Throughput rate in parts per hour.
What each result means
- Wet film thickness (mils)
- Predicted wet film thickness at withdrawal.
- Dry film thickness (mils)
- Predicted dry film thickness after cure.
- Paint per part (gal)
- Net paint consumed per part.
- Drip return per part (gal)
- Excess coating that drips back to tank.
- Drip return (%)
- Percentage of applied coating that drips off.
- Drain time (sec)
- Recommended drain time before curing.
- Total cycle time (sec)
- Immersion + withdrawal + drain time.
- Daily paint usage (gal)
- Total paint consumed per 8-hour shift.
- Tank turnover (days)
- Working days to consume one full tank volume.
How this is calculated
Worked example, using the default values
- Identify Input Parameters4 parametersWithdrawal speed (in/min) = 6, Viscosity (cps) = 200, Volume solids (%) = 45, Coating density (lb/gal) = 10 = 7 input(s) provided
- Calculate Dry film thicknessDry film thickness = wftMils * (volumeSolidsPct / 100)0.47 = 0.47
- Calculate Daily paint usageDaily paint usage = effectiveWetVolumeGal * partsPerShift1.1 = 1.1
- Calculate Wet film thicknessWet film thickness = k * sqrt(viscosityCps) * pow(withdrawalSpeedInMin, 0.6)1.04 = 1.04
- Calculate Paint per partPaint per part = wetVolumeGal * (1 - dripLossPct / 100)0.0045 = 0.0045
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
Industrial Coating Spec Calculator
Calculate wet film thickness, practical coverage, and material quantities from dry film thickness and percent solids specifications.
Ceramics & PotteryGlaze Thickness Calculator
Calculate recommended dip time and number of brush coats to achieve a target glaze thickness based on specific gravity and viscosity.
Industrial CoatingElectrostatic Spray Calculator
Calculate electrostatic spray coating coverage, transfer efficiency savings, and cost comparison vs conventional spray.
Industrial CoatingPaint Booth Airflow Calculator
Calculate required CFM, air velocity, fan sizing, and OSHA compliance for spray paint booths based on booth dimensions and type.
Industrial CoatingAbrasive Blasting Calculator
Calculate media consumption, production rates, and costs for abrasive blasting surface preparation based on SSPC standards.
More in Manufacturing, Industrial & Coatings.