Implant Loading Protocol Calculator
Immediate vs delayed score from factors.
Inputs
Results
Loading protocol (1-3)
1
Healing time (weeks)0
Primary stability (0-100)73
Provisional OK (0/1)1
Surface area (mm²)126
Overload risk (0-100)42
How to Use This Calculator
- Enter Insertion torque (Ncm), ISQ value, and Bone density (D1-D4).
- Set Implant length (mm).
- Review the Loading protocol (1-3) result.
- Use Healing time (weeks) and Primary stability (0-100) to inform your decision.
How the result changes with Insertion torque (Ncm)
| Insertion torque (Ncm) | Loading protocol (1-3) |
|---|---|
| 13 | 3 |
| 31 | 2 |
| 54 | 1 |
| 73 | 1 |
What each input means
- Insertion torque (Ncm)
- Final insertion torque value in Newton-centimeters.
- ISQ value
- Implant Stability Quotient from resonance frequency analysis.
- Bone density (D1-D4)
- Misch bone density classification.
- Implant length (mm)
- Implant body length in millimeters.
What each result means
- Loading protocol (1-3)
- 1 = immediate, 2 = early (6-8 wk), 3 = conventional (3-6 mo).
- Healing time (weeks)
- Recommended healing period before definitive loading.
- Primary stability (0-100)
- Composite stability score from torque and ISQ.
- Provisional OK (0/1)
- 1 = provisional restoration can be placed.
- Surface area (mm²)
- Approximate implant surface area in contact with bone.
- Overload risk (0-100)
- Risk of biomechanical overloading.
How this is calculated
Worked example, using the default values
- Identify Input Parameters4 parametersInsertion torque (Ncm) = 35, ISQ value = 70, Bone density (D1-D4) = 2, Implant length (mm) = 10 = 4 input(s) provided
- Calculate Loading protocol1 = 1
- Calculate Healing timeHealing time0 = 0
- Calculate Primary stabilityPrimary stability73 = 73
Engine last updated . Checked against 3 independently-derived tests — how we verify calculators.
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
More in Medical & Clinical.