Steel Erection Sequence Calculator

Plan steel erection duration, crane picks per day, crew sizing, and crane utilization based on tonnage, piece count, and crane capacity.

Inputs

tons
tons
ft

Results

Estimated Erection Days

7 days

Picks per Day27
Total Pieces180
Avg Piece Weight1,111 lbs
Tons per Day14.3 tons/day
Crane Utilization70%
Minimum Crew Size7 workers
Overweight Pieces0
How to Use This Calculator
  1. Enter the total steel tonnage, number of floors, and average pieces per floor.
  2. Set the crane capacity in tons at the working radius and the average pick distance in ft.
  3. Read Picks per Day and Estimated Erection Days to build the project schedule.
  4. Check Avg Piece Weight (lbs) — if it approaches the crane capacity, a larger crane or rigging plan is needed.
  5. Use Minimum Crew Size and Crane Utilization (%) to optimize labor deployment.
  6. Review Tons per Day to benchmark against typical steel erection productivity of 4–12 tons/day.