Energy Monitoring Budget Calculator

Submeter count and cost from monitoring requirements.

Inputs

Results

Total meters

18

Total capital cost ($)

$57,950.00

≈ 5 years of state college

Meter hardware ($)$37,800.00
Data gateways ($)$4,400.00
Wiring/integration ($)$9,450.00
Installation labor ($)$6,300.00
Annual software ($)$270.00
Annual maintenance ($)$2,646.00
Cost per sq ft ($)$0.58
Expected savings ($/yr)$20,000.00
Simple payback (years)2.9
Meters per 10k sq ft1.8
Total3Year Cost$58,760.00
How to Use This Calculator
  1. Enter Electrical submeters, BTU/thermal meters, and Gas meters.
  2. Set Water meters, Building area (sq ft), and Annual energy cost ($).
  3. Review Total meters and Total capital cost ($) ($).
  4. Use Meter hardware ($) ($) and Data gateways ($) ($) to inform your decision.

How the result changes with Electrical submeters

Electrical submetersTotal metersTotal capital cost ($)
5058$156,350.00
175183$467,700.00
325333$840,000.00
450458$1,151,350.00

What each input means

Electrical submeters
Number of CT-based electrical submeters (~$1,600 installed each).
BTU/thermal meters
Number of thermal energy (BTU) meters for chilled/hot water loops (~$3,500 each).
Gas meters
Number of natural gas submeters (~$2,500 each).
Water meters
Number of water submeters for domestic or process water (~$1,400 each).
Building area (sq ft)
Gross building area for cost-per-square-foot and metering density calculations.
Annual energy cost ($)
Total annual energy spend. Used to estimate M&V savings (typically 5-15% reduction) and payback.

What each result means

Total meters
Total number of submeters across all utility types.
Total capital cost ($)
Total installed cost: meters + gateways + wiring + installation labor.
Meter hardware ($)
Cost of meter hardware only.
Data gateways ($)
Cost of data acquisition gateways (1 per ~16 meters).
Wiring/integration ($)
Network wiring and system integration (~25% of meter cost).
Installation labor ($)
Commissioning, programming, and testing labor (~$350/meter).
Annual software ($)
Annual energy management software/platform license.
Annual maintenance ($)
Annual calibration and maintenance (7% of meter hardware).
Cost per sq ft ($)
Capital cost normalized by building area.
Expected savings ($/yr)
Conservative 8% energy cost reduction from monitoring and M&V.
Simple payback (years)
Years to recover capital + first year software cost from energy savings.
Meters per 10k sq ft
Metering density. ASHRAE 90.1 typically requires 1-3 meters per 10,000 sq ft.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Electrical submeters = 10, BTU/thermal meters = 4, Gas meters = 2, Water meters = 2 = 6 input(s) provided
  2. Calculate Total meters
    Total meters
    18 = 18
  3. Calculate Total capital cost
    Total capital cost = totalMeterCost + gatewayCost + wiringCost + installationLabor
    57950 = $57,950
  4. Calculate Meter hardware
    Meter hardware = electricalTotal + btuTotal + gasTotal + waterTotal
    37800 = $37,800
  5. Calculate Data gateways
    Data gateways = gatewaysNeeded * 2200
    4400 = $4,400

Engine last updated . Checked against 2 independently-derived tests how we verify calculators.

The questions that sit next to this one — chosen by subject, including calculators filed under a different category.

More in Construction & Building Trades.