Lighting Control Calculator
Lighting power density check per ASHRAE 90.1 with dimming zone, sensor, and control device counts.
Inputs
Results
Code LPD limit (W/sq ft)
0.82
Actual LPD (W/sq ft)0.82
Max allowed watts8,200
Occupancy sensors8
Daylight sensors3
Control relays8
Contactor panels1
Est. annual savings (kWh)9,379
Est. annual savings ($)$1,125.00
Code CompliantYes
Lpd Margin (%)0%
Time Clocks1
How to Use This Calculator
- Enter the total floor area in square feet and select the building type (1–10) to look up the ASHRAE 90.1 LPD limit.
- Enter installed lighting wattage if known, or leave at 0 to use the code maximum for budgeting.
- Enter the number of separately controlled lighting zones and the number of daylight zones with windows or skylights.
- Read the ASHRAE 90.1 LPD limit (W/sq ft), maximum allowed watts, and whether your design is code compliant.
- Use the occupancy sensor, daylight sensor, and control relay counts to size your lighting control system.
- Review the estimated annual energy savings in kWh and dollars from controls.
What each input means
- Floor area (sq ft)
- Total floor area of the space or building.
- Building type (1-10)
- 1=Office, 2=Retail, 3=School, 4=Hospital, 5=Hotel, 6=Warehouse, 7=Restaurant, 8=Manufacturing, 9=Parking, 10=Religious.
- Installed lighting (W)
- Total installed lighting wattage. Leave 0 to use the code maximum.
- Lighting zones
- Number of separately controlled lighting zones.
- Daylight zones
- Zones with access to daylight (windows/skylights) requiring photo sensors.
What each result means
- Code LPD limit (W/sq ft)
- Maximum lighting power density per ASHRAE 90.1 Table 9.5.1.
- Actual LPD (W/sq ft)
- Installed or calculated lighting power density.
- Max allowed watts
- Total wattage allowed by code for this building type and area.
- Occupancy sensors
- Occupancy/vacancy sensors needed (one per zone).
- Daylight sensors
- Photosensors for daylight-responsive dimming.
- Control relays
- Switching/dimming relays (one per zone).
- Contactor panels
- Lighting relay panels (24 relays each).
- Est. annual savings (kWh)
- Estimated annual energy savings from controls.
- Est. annual savings ($)
- Estimated annual cost savings at $0.12/kWh.
How this is calculated
Worked example, using the default values
- Identify Input Parameters4 parametersFloor area (sq ft) = 10000, Building type (1-10) = 1, Installed lighting (W) = 0, Lighting zones = 8 = 5 input(s) provided
- Calculate Code LPD limitCode LPD limit = lpdEntry.lpd0.82 = 0.82
- Calculate Actual LPDActual LPD = actualWatts / floorAreaSqFt0.82 = 0.82
- Calculate Max allowed wattsMax allowed watts = lpdLimit * floorAreaSqFt8200 = 8200
Engine last updated . Checked against 3 independently-derived tests — how we verify calculators.
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
Construction Electrical
Electrical Panel Schedule Calculator
Panel load calculation with NEC demand factors for lighting, receptacles, motors, and HVAC.
Construction ElectricalData Cable Calculator
Cable runs, conduit fill per NEC Table 1, and pathway sizing from network drop count.
FacadeThermal Envelope Calculator
R-value and continuous insulation from climate zone.
Hvac ControlsSequence of Operations Calculator
Control sequence definition from design intent.