Skip to main content
Calcimator

Electrical Panel Schedule Calculator

Panel load calculation with NEC demand factors for lighting, receptacles, motors, and HVAC.

Inputs

Results

Total demand (VA)

38,750

Total connected (VA)40,000
Demand factor (%)96.9
Demand load amps (A)107.6
Adjusted amps (125%)129.1
Min bus rating (A)150
Bus loading (%)86
Recommended panel spaces12
How to Use This Calculator
  1. Enter the connected lighting, receptacle, motor, and HVAC loads in volt-amperes from your circuit schedule.
  2. Set the panel bus voltage (208 V for 120/208 V systems, 480 V for 277/480 V systems).
  3. Select single-phase (1) or three-phase (3) to match your panel type.
  4. Read the total demand VA after NEC 220 demand factors are applied and the minimum bus rating in amperes.
  5. Check the bus loading percentage and recommended panel spaces to confirm adequate capacity.
Ad Placeholder

Related Calculators

Ad Placeholder