Skip to main content
Calcimator

Floor Stripping Calculator

Calculate chemical stripper, pad, and finish requirements for stripping and recoating commercial floors.

About this calculator

Stripping old wax finish off a commercial floor isn't a flat per-square-foot job — how much stripper you need depends on both the floor material and how many old coat layers have built up. This calculator starts from a base coverage rate per gallon that varies by surface (800 sq ft for VCT, 700 for linoleum, 600 for more porous concrete), then reduces that coverage by 15% for each additional coat layer beyond the first, since thicker wax buildup soaks up more stripping chemical before it can lift the finish. Divide your floor area by that adjusted coverage rate to get gallons of stripper needed. Stripping pads are estimated at one per roughly 300 sq ft before the abrasive surface dulls.

Labor time assumes a base rate of 500 sq ft/hour, slowed by 20% for each extra coat layer — more buildup means more dwell time and more passes with the buffer. Drying time before recoating varies by floor type, from 1 hour for VCT up to 3 hours for concrete, which is naturally more porous and holds moisture longer. Finally, the calculator assumes a standard 4-coat recoat at roughly 2,000 sq ft per gallon of finish per coat. Real jobs vary: heavy, years-old buildup often needs two or three full stripping passes rather than one, and it's worth testing dwell time on a small section first, since stripper left on too long can haze certain floor types while too little dwell won't lift old wax at all.

Inputs

sq ft

Results

Stripper Needed

3.46 gal

≈ 3 milk jugs

Labor Hours

5.6 hrs

Stripping Pads7
Drying Time1 hrs
Floor Finish Needed4 gal
How to Use This Calculator
  1. Enter floor area in sq ft, number of existing wax coat layers, and floor type.
  2. Review Stripper Needed (gallons) and Stripping Pads required.
  3. Plan for 2–3 passes with heavy buildup — test a small area first to gauge dwell time needed.

How the result changes with Floor Area

Floor AreaStripper NeededLabor Hours
1,0001.73 gal2.8 hrs
1,5002.6 gal4.2 hrs
3,0005.19 gal8.4 hrs
5,0008.65 gal14 hrs

What each input means

Floor Area
Total floor area to strip in square feet.
Existing Coat Layers
Number of existing finish coat layers to remove. More layers require more stripper.
Floor Type
The floor surface material, which affects stripper coverage and drying time.

What each result means

Stripper Needed
Gallons of floor stripper chemical required.
Stripping Pads
Number of stripping pads needed (~300 sqft each).
Labor Hours
Estimated stripping time excluding drying.
Drying Time
Time for stripped floor to dry before recoating.
Floor Finish Needed
Gallons of floor finish for 4 recoat layers.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    Floor Area = 2000, Existing Coat Layers = 3, Floor Type = 0 = 3 input(s) provided
  2. Calculate Stripper Needed
    Stripper Needed
    3.46 = 3.46
  3. Calculate Labor Hours
    Labor Hours
    5.6 = 5.6
  4. Calculate Stripping Pads
    Stripping Pads
    7 = 7
  5. Calculate Drying Time
    Drying Time
    1 = 1

Engine last updated . Checked against 2 independently-derived tests — how we verify calculators. Built by Paul Gunder, a software engineer, not a licensed financial, medical, or legal professional.

Frequently Asked Questions

Why does each additional coat layer reduce stripper coverage by 15% instead of a fixed amount?

The calculator applies a compounding factor of 0.85 per layer beyond the first (`baseCoverage * 0.85^(layers-1)`), so coverage shrinks proportionally rather than by a flat number of square feet each time. That mirrors how thicker wax buildup works in practice — each additional layer adds roughly the same relative resistance to the stripping chemical, so the effect compounds rather than adding up linearly.

Why does concrete need less stripper coverage per gallon but longer drying time than VCT?

Concrete's base coverage is only 600 sq ft/gallon versus 800 for VCT because its porous surface absorbs more stripping chemical before it can lift the finish, and that same porosity is why concrete's drying time is set at 3 hours versus 1 hour for VCT — the same open surface that soaks up stripper also holds moisture longer afterward. Both numbers trace back to the same physical property of the material, just showing up in two different outputs.

How does the labor-hours estimate account for extra coat layers?

The base stripping rate is 500 sq ft/hour, and the calculator slows that rate by 20% for each layer beyond the first (`500 / (1 + (layers-1) * 0.2)`), reflecting that more buildup means more dwell time before the stripper can work and more scrubbing passes with the buffer to fully lift it. A job with 5 coat layers takes noticeably longer per square foot than the same floor with just 1-2 layers, even though it's identical square footage.

Why does the finish estimate always assume 4 recoat layers regardless of what I strip?

The calculator uses a fixed 4-coat standard recoat assumption at roughly 2,000 sq ft/gallon per coat, independent of how many old layers you removed, because the number of coats you strip off has no bearing on how many fresh coats are needed to properly protect and finish the floor going forward. If your facility's spec calls for 3 or 5 coats instead of 4, scale the recoat gallons figure proportionally.

The questions that sit next to this one — chosen by subject, including calculators filed under a different category.

More in Home, Garden & Maintenance.