Pool Cost Estimator

Estimate the total cost of building a concrete, fiberglass, or vinyl liner pool including excavation, shell, equipment, and decking.

Inputs

ft
ft
ft

Results

Total Estimated Cost

$58,250.00

≈ 5 years of state college

Excavation$13,500.00
Pool Shell$30,750.00
Equipment & Plumbing$7,250.00
Decking$6,750.00
Est. Annual Maintenance$1,800.00
How to Use This Calculator
  1. Select your pool type: 0 = above-ground, 1 = fiberglass, 2 = vinyl liner, or 3 = concrete/gunite.
  2. Enter the pool length, width, and average depth in feet to size the shell.
  3. Toggle Includes Deck, Includes Heater, and Includes Salt System to 1 for each feature you want.
  4. Review the Total Cost breakdown: Excavation Cost, Shell Cost, Equipment Cost, and Decking Cost.
  5. Use the Annual Maintenance estimate to plan your yearly upkeep budget beyond the build cost.

How the result changes with Pool Length

Pool LengthTotal Estimated Cost
17$41,675.00
35$64,625.00
56$91,400.00
73$113,075.00

What each input means

Pool Type
1 = Concrete/Gunite, 2 = Fiberglass, 3 = Vinyl Liner.
Pool Length
Length of the pool.
Pool Width
Width of the pool.
Average Depth
Average depth of the pool.
Include Deck
1 = Include concrete decking, 0 = No deck.
Include Heater
1 = Include pool heater (~$4,000), 0 = No heater.
Include Salt System
1 = Include salt chlorinator (~$2,500), 0 = No salt system.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Pool Type = 2, Pool Length = 30, Pool Width = 15, Average Depth = 5 = 7 input(s) provided
  2. Calculate Total Estimated Cost
    Total Estimated Cost
    58250 = $58,250
  3. Calculate Excavation
    Excavation
    13500 = $13,500
  4. Calculate Pool Shell
    Pool Shell
    30750 = $30,750