Termite Barrier Cost Calculator
Estimate physical and chemical termite barrier cost per linear foot, including trenching, drilling, and material costs for new or existing structures.
Inputs
Results
Total barrier cost ($)
$3,518.52
≈ 4 smartphones
Cost per linear ft ($)
$17.59
≈ 4 cups of coffee
How to Use This Calculator
- Enter the linear footage of the structure foundation perimeter.
- Select the treatment method: liquid barrier, baiting system, or combination.
- Input the local cost per linear foot for each method.
- Review the Estimated Treatment Cost and the Annual Renewal or Monitoring Fee.
- Compare the 10-Year Total Cost of each method to select the most economical long-term option.
How the result changes with Foundation perimeter (ft)
| Foundation perimeter (ft) | Total barrier cost ($) | Cost per linear ft ($) |
|---|---|---|
| 518 | $9,112.96 | $17.59 |
| 1,763 | $31,015.74 | $17.59 |
| 3,257 | $57,299.07 | $17.59 |
| 4,502 | $79,201.85 | $17.59 |
What each input means
- Foundation perimeter (ft)
- Total linear feet of foundation requiring barrier treatment.
- Barrier type (0=Chemical, 1=Physical, 2=Combined)
- 0 = Liquid termiticide. 1 = Physical (stainless mesh/granite). 2 = Both combined.
- Trench depth (ft)
- Depth of treatment trench. 4 ft is standard for reaching footer depth.
- Trench width (inches)
- Width of treatment trench adjacent to foundation.
- Stage (0=New construction, 1=Existing)
- New construction is easier/cheaper. Existing requires working around landscaping and concrete.
- Access difficulty (1=Easy, 2=Moderate, 3=Difficult)
- 1 = Open access. 2 = Some obstacles. 3 = Tight spaces, heavy landscaping.
What each result means
- Total barrier cost ($)
- Complete installed cost for the termite barrier system.
- Cost per linear ft ($)
- Total cost divided by perimeter length.
- Chemical material ($)
- Cost of liquid termiticide solution.
- Physical barrier material ($)
- Cost of stainless mesh or granite particle barrier.
- Labor cost ($)
- Trenching, installation, and backfill labor.
- Drill & treat cost ($)
- Cost for drilling through concrete (existing structures only).
- Termiticide solution (gal)
- Total gallons of diluted termiticide needed.
- Trench volume (ft³)
- Total volume of trench excavation.
- Typical warranty (years)
- Expected warranty period by barrier type.
- Annualized cost ($)
- Total cost spread over warranty period.
How this is calculated
Worked example, using the default values
- Identify Input Parameters4 parametersFoundation perimeter (ft) = 200, Barrier type (0=Chemical, 1=Physical, 2=Combined) = 0, Trench depth (ft) = 4, Trench width (inches) = 6 = 6 input(s) provided
- Calculate Total barrier costTotal barrier cost = totalMaterialCost + totalLaborCost + drillTreatCost3518.52 = $3,518.52
- Calculate Cost per linear ftCost per linear ft = totalCost / perimeterFt17.59 = $17.59
- Calculate Chemical material800 = $800
- Calculate Physical barrier material0 = $0
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
Bait Station Monitoring Calculator
Calculate bait station count, spacing, installation, and annual monitoring costs based on building perimeter and NPMA guidelines.
Structural PestWDO Inspection Calculator
Estimate wood-destroying organism inspection cost, time, and scope based on property size, features, and inspection purpose (real estate, VA/FHA, commercial).
Structural PestFumigation Coverage Calculator
Calculate tenting coverage, fumigant volume (Vikane/sulfuryl fluoride), cylinder count, and cost for structural fumigation by building dimensions and target pest.
More in Home, Garden & Maintenance.