Skip to main content
Calcimator

CAD/CAM Restoration Calculator

Same-day crown cost: equipment, material, and time.

Inputs

%

Results

Cost per restoration ($)

$96.36

≈ 6 movie tickets

Total batch cost ($)$96.36
Material cost ($)$30.00
Bur wear cost ($)$2.13
Labor cost ($)$42.00
Overhead ($)$22.24
Milling time (min)12
Design time (min)15
Sintering/firing (hrs)0.4
Active hands-on time (min)27
Shrinkage compensation (%)0%
Material NameLithium Disilicate (e.max)
Total Passive Time (min)24
How to Use This Calculator
  1. Select the Material Type and enter the Block/Disc Cost.
  2. Input the Number of Restorations and CAD Design Time in minutes.
  3. Enter the Dentist/Tech Rate ($/hr) and Bur Set Cost with restorations per set.
  4. Set the Overhead % to capture indirect costs.
  5. Review Cost per Restoration to set competitive in-office milling fees.

How the result changes with Dentist/tech rate ($/hr)

Dentist/tech rate ($/hr)Cost per restoration ($)
50$59.96
175$105.46
325$160.06
450$205.56

What each input means

Material type
Select restoration material.
Block/disc cost ($)
Cost per milling block or disc (e.max ~$25-45, zirconia ~$15-35, composite ~$12-20).
Number of restorations
Number of crowns, inlays, onlays, or veneers to fabricate.
CAD design time (min)
Minutes per restoration for digital design/margin marking (typically 10-25 min).
Dentist/tech rate ($/hr)
Hourly rate for the person doing CAD design.
Bur set cost ($)
Cost for a diamond bur set (step bur + finishing bur).
Restorations per bur set
Expected bur set lifetime in number of restorations (30-50 typical).
Overhead (%)
Equipment depreciation, software license, utilities, etc.

What each result means

Cost per restoration ($)
All-in cost per crown/inlay/onlay including overhead.
Total batch cost ($)
Total cost for all restorations in this batch.
Material cost ($)
Block/disc material cost.
Bur wear cost ($)
Prorated milling bur cost.
Labor cost ($)
Design + mill supervision labor.
Overhead ($)
Allocated equipment and facility overhead.
Milling time (min)
Total milling machine time.
Design time (min)
Total CAD design time.
Sintering/firing (hrs)
Post-mill heat treatment time (zirconia sintering or crystallization firing).
Active hands-on time (min)
Total time requiring operator attention.
Shrinkage compensation (%)
Milling oversize percentage to compensate for sintering shrinkage (zirconia ~20%).

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Material type = 0, Block/disc cost ($) = 30, Number of restorations = 1, CAD design time (min) = 15 = 8 input(s) provided
  2. Calculate Cost per restoration
    Cost per restoration = totalCost / restorationCount
    96.36 = $96.36
  3. Calculate Total batch cost
    Total batch cost = directCost + overhead
    96.36 = $96.36
  4. Calculate Material cost
    Material cost = blockCost * restorationCount
    30 = $30

Engine last updated . Checked against 1 independently-derived test how we verify calculators.

The questions that sit next to this one — chosen by subject, including calculators filed under a different category.

More in Medical & Clinical.