Field Sanitation Calculator

Field sanitation requirements from personnel count.

Inputs

Results

Latrine units

7

Handwash stations4
Soakage pits5
Burn pits2
JP-8 for latrines (gal)750
Disinfectant (gal)120
How to Use This Calculator
  1. Enter the total personnel count at the field site.
  2. Set the operation duration (days) for cumulative supply calculations.
  3. Select climate zone: 0=Cold, 1=Temperate, 2=Hot/Arid — hot climates require more water and more frequent waste disposal.
  4. Review Latrine units (1 per 8 personnel), Handwash stations, and Soakage pits needed for the site.
  5. Use JP-8 for latrines (gal) and Disinfectant (gal) to pre-stage sanitation supplies.

How the result changes with Personnel

PersonnelLatrine units
1,00932
3,507110
6,504204
9,001282

What each input means

Personnel
Total personnel at the site.
Duration (days)
Duration of field operations.
Climate (0=cold, 1=temp, 2=hot)
0=Cold, 1=Temperate, 2=Hot/arid.

What each result means

Latrine units
4-seat burnout latrine units needed.
Handwash stations
Field handwashing stations.
Soakage pits
Gray water soakage pits.
Burn pits
Solid waste burn pits.
JP-8 for latrines (gal)
Fuel for burning latrine waste.
Disinfectant (gal)
Disinfectant for sanitation.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    Personnel = 200, Duration (days) = 30, Climate (0=cold, 1=temp, 2=hot) = 1 = 3 input(s) provided
  2. Calculate Latrine units
    Latrine units = ceil(latrineSeats / 4)
    7 = 7
  3. Calculate Handwash stations
    Handwash stations = ceil(latrineUnits / 2)
    4 = 4
  4. Calculate Soakage pits
    Soakage pits = ceil(grayWaterGalPerDay / 200)
    5 = 5