Contingency Calculator

Appropriate contingency percentage from project risk assessment.

Inputs

Results

Recommended Contingency (%)

12.06%

Total Contingency ($)

$120,625.00

≈ 8 used cars

Design Contingency (%)4.83%
Construction Contingency (%)7.24%
Design Contingency ($)$48,250.00
Construction Contingency ($)$72,375.00
Total with Contingency ($)$1,120,625.00
How to Use This Calculator
  1. Enter the current estimated project cost before contingency is added.
  2. Select the project phase: 0 = concept/schematic, 1 = design development, 2 = construction documents, 3 = bid/negotiation.
  3. Rate project complexity on a 1–5 scale (1 = simple/standard, 5 = highly complex or unique).
  4. Rate site risk on a 1–5 scale (1 = well-known site, 5 = unknown conditions or difficult terrain).
  5. Rate scope clarity on a 1–5 scale (1 = vague/evolving, 5 = fully defined and documented).
  6. Read the recommended contingency percentage, split between design and construction reserves, and the total project cost with contingency included.

How the result changes with Complexity Rating (1–5)

Complexity Rating (1–5)Recommended Contingency (%)Total Contingency ($)
1.411.26%$112,625.00
2.411.76%$117,625.00
3.612.36%$123,625.00
4.612.86%$128,625.00

What each input means

Estimated Project Cost ($)
Current total estimated construction cost before contingency.
Project Phase
0 = Concept/Schematic, 1 = Design Development, 2 = Construction Docs, 3 = Bid/Negotiation.
Complexity Rating (1–5)
1 = simple/standard, 5 = highly complex/unique construction.
Site Risk (1–5)
1 = well-known/easy access, 5 = unknown conditions/difficult terrain.
Scope Clarity (1–5)
1 = vague/evolving, 5 = fully defined and documented.

What each result means

Recommended Contingency (%)
Recommended total contingency percentage based on phase and risk.
Design Contingency (%)
Portion allocated to design-phase unknowns.
Construction Contingency (%)
Portion allocated to field/construction unknowns.
Design Contingency ($)
Design contingency in dollars.
Construction Contingency ($)
Construction contingency in dollars.
Total Contingency ($)
Total recommended contingency reserve.
Total with Contingency ($)
Estimated cost plus contingency.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Estimated Project Cost ($) = 1000000, Project Phase = 1, Complexity Rating (1–5) = 3, Site Risk (1–5) = 2 = 5 input(s) provided
  2. Calculate Recommended Contingency
    Recommended Contingency = lowPct + (highPct - lowPct) * combinedFactor
    12.06 = 12.06%
  3. Calculate Total Contingency
    Total Contingency = designContingency + constructionContingency
    120625 = $120,625
  4. Calculate Design Contingency
    4.83 = 4.83%
  5. Calculate Construction Contingency
    Construction Contingency = baseContingencyPct - designContingencyPct
    7.24 = 7.24%

Engine last updated . Checked against 2 independently-derived tests how we verify calculators.