Mobilization Cost Calculator
Mobilization and demobilization cost from distance and scope.
Inputs
Results
Total Mobilization ($)
$8,625.00
≈ 9 smartphones
Total Mob + Demob ($)
$12,937.50
≈ 9 months of rent
Equipment Transport ($)$825.00
Crew Travel / Per Diem ($)$2,800.00
Temp Facilities Setup ($)$5,000.00
Total Demobilization ($)$4,312.50
Cost Per Worker ($)$1,617.19
How to Use This Calculator
- Enter the one-way distance from your home base to the project site in miles.
- Enter the number of equipment loads (flatbed/lowboy truckloads) and the cost per load per mile.
- Enter the crew size and number of travel/setup days plus the per diem rate per worker per day.
- Enter temporary facilities cost (trailers, temp power, fencing, signage, sanitation).
- Set the demobilization ratio as a fraction of mobilization cost (typically 0.40–0.60).
- Read total mobilization, demobilization, and combined mob+demob cost to include in your bid.
How the result changes with Temp Facilities Cost ($)
| Temp Facilities Cost ($) | Total Mobilization ($) | Total Mob + Demob ($) |
|---|---|---|
| 20,000 | $23,625.00 | $35,437.50 |
| 70,000 | $73,625.00 | $110,437.50 |
| 130,000 | $133,625.00 | $200,437.50 |
| 180,000 | $183,625.00 | $275,437.50 |
What each input means
- Distance to Site (miles)
- One-way distance from home base to the project site.
- Equipment Loads
- Number of flatbed/lowboy loads needed to transport equipment.
- Cost / Load / Mile ($)
- Trucking cost per load per mile (lowboy/flatbed rate).
- Number of Workers
- Crew members who need travel and per diem.
- Travel / Setup Days
- Days spent traveling and setting up before productive work begins.
- Per Diem Rate ($/day)
- Daily per diem for lodging, meals, and incidentals per worker.
- Temp Facilities Cost ($)
- Setup cost for trailers, temp power, fencing, signage, and sanitation.
- Demob / Mob Ratio
- Demobilization cost as a fraction of mobilization (typically 0.40–0.60).
What each result means
- Equipment Transport ($)
- Cost to haul equipment to and from the site.
- Crew Travel / Per Diem ($)
- Worker travel and per diem for mobilization period.
- Temp Facilities Setup ($)
- Temporary facilities and site setup costs.
- Total Mobilization ($)
- Total cost to mobilize to the project site.
- Total Demobilization ($)
- Estimated cost to demobilize from the site.
- Total Mob + Demob ($)
- Combined mobilization and demobilization cost.
- Cost Per Worker ($)
- Total mob/demob divided by number of workers.
How this is calculated
Worked example, using the default values
- Identify Input Parameters4 parametersDistance to Site (miles) = 50, Equipment Loads = 3, Cost / Load / Mile ($) = 5.5, Number of Workers = 8 = 8 input(s) provided
- Calculate Total MobilizationTotal Mobilization = equipmentTransportCost + crewTravelCost + facilitiesSetupCost8625 = $8,625
- Calculate Total Mob + DemobTotal Mob + Demob = totalMobilization + totalDemobilization12937.5 = $12,937.5
- Calculate Equipment TransportEquipment Transport = numEquipmentLoads * distanceMiles * costPerLoadPerMile825 = $825
- Calculate Crew Travel / Per DiemCrew Travel / Per Diem = numWorkers * travelDays * perDiemRate2800 = $2,800
Engine last updated . Checked against 1 independently-derived test — how we verify calculators.
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
Construction Estimating
Contingency Calculator
Appropriate contingency percentage from project risk assessment.
Construction EstimatingBond Cost Calculator
Payment and performance bond premium from contract value.
Construction EstimatingEquipment Rental Cost Calculator
Daily, weekly, and monthly equipment cost comparison.
Construction ManagementConstruction Bid Calculator
Build a construction bid price from material, labor, equipment, overhead, and profit margin. See the full cost breakdown.
More in Construction & Building Trades.