Cleaning cost from building height and facade material.

Inputs

Results

Total project cost ($)

$4,475.00

≈ 4 smartphones

Project duration (days)

4

Cleaning labor ($)$2,475.00
Equipment rental ($)$2,000.00
Cost per sq ft ($)$0.90
Water usage (gal)15,000
How to Use This Calculator
  1. Enter Facade Area in sq ft and Building Height in feet to determine access equipment needs.
  2. Select Material Type (glass, stone, brick, metal, or EIFS) — softer materials need gentler methods.
  3. Choose Cleaning Method: pressure wash is fastest, chemical suits stains, steam for delicate surfaces.
  4. Enter Number of Building Sides to include all facades in the estimate.
  5. Review Total Cost, Cost per Sq Ft, and Project Duration in days to evaluate contractor bids.

What each input means

Facade area (sq ft)
Total exterior facade area to be cleaned.
Building height (ft)
Height of the building (affects access equipment choice).
Number of stories
Number of stories (affects pricing premium for height).
Material (0=glass,1=stone,2=brick,3=metal,4=EIFS)
Facade material type affects cleaning rate and method.
Method (0=pressure,1=chemical,2=steam,3=blast)
Cleaning method: 0=pressure wash, 1=chemical, 2=steam, 3=abrasive blast.
Number of building sides
Number of facade sides to clean (affects equipment mobilization).

What each result means

Total project cost ($)
Combined cleaning labor and equipment cost.
Cleaning labor ($)
Labor and material cost for cleaning.
Equipment rental ($)
Swing stage or boom lift rental cost.
Cost per sq ft ($)
Total cost divided by facade area.
Project duration (days)
Estimated working days to complete all sides.
Water usage (gal)
Estimated water consumption for cleaning.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Facade area (sq ft) = 5000, Building height (ft) = 60, Number of stories = 5, Material (0=glass,1=stone,2=brick,3=metal,4=EIFS) = 0 = 6 input(s) provided
  2. Calculate Total project cost
    Total project cost = cleaningCost + equipmentCost
    4475 = $4,475
  3. Calculate Project duration
    Project duration = daysPerSide * accessSides
    4 = 4
  4. Calculate Cleaning labor
    Cleaning labor = facadeArea * adjustedRate
    2475 = $2,475
  5. Calculate Equipment rental
    Equipment rental = totalDays * equipmentDailyRate
    2000 = $2,000