Change Order Calculator
Price a change order with the job's own labor rate and material and subcontractor markups, subtract a credit for work taken out, and see the signed change, the new contract total and the schedule effect.
About this calculator
A change order moves work into or out of a job after the price has already been agreed. The work is new; the rates are not. Pricing the addition with the same labor rate, the same material markup and the same subcontractor markup that produced the original number keeps the arithmetic to something a customer can follow, and it stops a figure being guessed at on the tailgate while everyone waits. Enter the contract as it stands, then the hours, materials and subcontracted work the change adds. If something is coming out of the job instead, enter what the original quote charged for it as a credit. Give the schedule effect in days, negative when the change shortens the job. On the default job, six extra hours at $77.47 come to $464.82 and $420.00 of materials at a 25% markup to $525.00, so the change is +$989.82, the contract becomes $9,489.82 and the schedule reads +1 day. The contract, hours, rate, materials and markup are illustrative.
Order of operations matters. Labor, materials and subcontracted work are each rounded to the cent on their own while every one of them is still positive, and the credit is subtracted afterward, so nothing is rounded while negative and a credit of a given size always moves the total by the same amount. Write the change up before the work starts: a conversation over a printed sheet with three figures on it is about a price, while one held after the work is in is about a bill. One state's rule is worth knowing as information, not legal advice. California's Business and Professions Code section 7159.6 says an extra work or change order is not enforceable against a buyer of home-improvement work unless it sets forth the scope of work, the amount to be added to or subtracted from the contract, and the effect on the progress payments or the completion date. This calculator prices the amount and the schedule effect; the scope you describe yourself. Other states set their own requirements or none at all.
Legal Disclaimer
This calculator provides general estimates only and does not constitute legal advice. Laws, regulations, and court procedures vary significantly by jurisdiction. Consult a licensed attorney in your area for advice specific to your situation.
Estimates Only
This calculator provides planning estimates based on typical industry figures and the inputs you enter. Actual quantities, rates, and costs vary by project, site, and location. Verify results against current local rates and actual measurements before relying on them for budgets, bids, or compliance.
Inputs
Results
Change amount
$989.82
≈ 8 pairs of sneakers
New contract total
$9,489.82
≈ 9 smartphones
Figures current as of 2026. Sources: California Business and Professions Code § 7159.6, FAR 2.101, Definitions (Change order)
How to Use This Calculator
- Enter the contract as it stands, then the extra labor hours and the labor rate the job was priced with.
- Enter material and subcontractor costs and the markups the original quote used.
- If work is coming out of the job, enter its original price as a credit.
- Enter the schedule effect in days, negative if the change shortens the job, then read the change amount and new contract total.
How the result changes with Material cost
| Material cost | Change amount | New contract total |
|---|---|---|
| $210.00 | $727.32 | $9,227.32 |
| $315.00 | $858.57 | $9,358.57 |
| $630.00 | $1,252.32 | $9,752.32 |
| $1,050.00 | $1,777.32 | $10,277.32 |
What each input means
- Original contract amount
- The contract as it stands now, before this change. The default is illustrative.
- Extra labor hours
- Hours of added labor.
- Labor rate, the same as the job's
- Use the rate the original quote used, so the change reads as an extension of the quote.
- Material cost
- What the added materials cost you.
- Material markup
- The same markup on cost as the original quote.
- Subcontractor price
- What a subcontractor charges you for the added work.
- Credit for work taken out, at its price
- What the original quote charged for work that is now coming out of the job.
- Days added to the schedule (negative to shorten)
- The effect on the completion date, in days. Negative when the change shortens the job.
What each result means
- Change amount
- Positive adds to the contract, negative takes away.
How this is calculated
Formula
change = labor hours x rate + material x (1 + markup) + sub x (1 + markup) - credit; new total = contract + changeWorked example, using the default values
- Labor at the job's rateextra hours x labor rate6 h x $77.47 = $464.82
- Materials, marked upmaterial cost x (1 + markup)$420.00 x (1 + 25%) = $525.00
- Subcontractor, marked upsub price x (1 + markup)$0.00 x (1 + 0%) = $0.00
- Change amountlabor + materials + subcontractor - credit for work taken out$464.82 + $525.00 + $0.00 - $0.00 = +$989.82
- New contract totaloriginal contract + change$8,500.00 + $989.82 = $9,489.82
Figures and sources
- California home-improvement change orders: scope, amount added or subtracted, effect on payments or completion date (one state's rule) (2026) — California Business and Professions Code § 7159.6
- Federal definition of a change order: a written order, signed by the contracting officer (2026) — FAR 2.101, Definitions (Change order)
Engine last updated . Checked against 2 independently-derived tests — how we verify calculators. Built by Paul Gunder, a software engineer, not a licensed financial, medical, or legal professional.
Frequently Asked Questions
What should a change order say?
At minimum: the scope of the added or removed work, the amount to be added to or subtracted from the contract, and the effect on the schedule and payments, written down and signed before the work starts. California's home-improvement rule (Business and Professions Code section 7159.6) makes a change order unenforceable against the buyer unless it sets out exactly those three things. Other states have different rules, so check what applies where you work; this is information, not legal advice.
How do I price a credit for work taken out?
Enter what the original quote charged the customer for that work, not what it would have cost you. The calculator subtracts it after pricing the added work, so a net-negative change shows as a negative amount and a smaller contract. A reduction is still a change order and worth writing up as carefully as an addition, because it is the document that proves the reduction was agreed.
Why should a change order use the job's own rates?
Because the rates are not new decisions. Using the same labor rate, material markup and subcontractor markup as the original quote makes the change an extension of that price instead of a second opinion about your pricing. It also keeps the arithmetic simple enough for a customer to follow on one sheet.
How is the schedule effect entered?
As a whole number of days. Positive extends the job, negative shortens it, and zero reads as no change. The calculator reports it beside the dollar change so that both effects of the order, price and time, are stated together, which is what a change order needs to record.
Why is each line rounded before the credit is subtracted?
Labor, materials and subcontracted work are each rounded to the nearest cent while they are positive amounts, then the credit is taken off. Nothing is rounded while it is negative, so the same credit always moves the contract by the same amount, whichever way the net change points. An exact half cent, such as 1.5 hours at $33.33, rounds up.
Related Calculators
The questions that sit next to this one — chosen by subject, including calculators filed under a different category.
Job Estimate Builder
Price a contractor quote line by line and see your gross margin.
Construction ManagementConstruction Bid Calculator
Build a construction bid price from material, labor, equipment, overhead, and profit margin. See the full cost breakdown.
Construction ManagementCritical Path Method Calculator
Estimate project duration using Critical Path Method (CPM). Calculate critical path length, total float, and schedule compression potential.
Construction ManagementDaily Report Score Calculator
Generate a daily site score from safety incidents, inspection results, and weather delays. Track safety, quality, and productivity alongside your logged workforce count.
More in Construction & Building Trades.