Estimate per-square-foot cost for polished concrete floors based on exposure level, polish grade, and optional dye/stain guard.

Inputs

Results

Total project cost ($)

$5,340.00

≈ 5 smartphones

Cost per sq ft ($)$5.34
Total grinding/polishing passes6
Grinding passes3
Polishing passes3
Densifier (gallons)4
Estimated labor hours20
Tooling cost ($)$750.00
Labor cost ($)$3,900.00
Material cost ($)$1,140.00
How to Use This Calculator
  1. Enter the total floor area in sq ft to be ground and polished.
  2. Select aggregate exposure level: 1=cream (no aggregate), 2=salt & pepper, 3=medium aggregate, 4=large aggregate.
  3. Choose the polish level: 1=flat grind only, 2=honed (400 grit), 3=polished (800 grit), 4=high-polish (1500+ grit).
  4. Enter the number of dye colors (0 for natural concrete) and whether to apply a stain guard (0 or 1).
  5. Review Total Passes, Densifier (gallons), and Estimated Labor Hours to plan crew scheduling.
  6. Use Total Project Cost and Cost per Sq Ft to prepare bids or compare polishing against other flooring options.

How the result changes with Floor area (sq ft)

Floor area (sq ft)Total project cost ($)
50,090$267,480.60
175,065$934,847.10
325,035$1,735,686.90
450,010$2,403,053.40

What each input means

Floor area (sq ft)
Total floor area to be ground and polished.
Aggregate exposure (1-4)
1 = cream/no aggregate, 2 = salt & pepper, 3 = medium aggregate, 4 = large aggregate.
Polish level (1-4)
1 = flat grind only, 2 = honed (400 grit), 3 = polished (800 grit), 4 = high-polish (1500+ grit).
Dye colors (0-3)
Number of concrete dye colors. 0 = natural concrete color.
Stain guard (0 or 1)
1 = apply impregnating stain guard sealer, 0 = skip.

What each result means

Total project cost ($)
Combined tooling, densifier, dye, labor, and equipment cost.
Cost per sq ft ($)
All-in cost per square foot.
Total grinding/polishing passes
Combined number of grinding and polishing steps.
Grinding passes
Metal-bond diamond grinding steps for aggregate exposure.
Polishing passes
Resin-bond diamond polishing steps for shine.
Densifier (gallons)
Lithium silicate densifier applied between honing and polishing.
Estimated labor hours
Total grinding/polishing time at ~300 sq ft/hr per pass.
Tooling cost ($)
Diamond tooling cost for all passes.
Labor cost ($)
Operator labor for grinding, polishing, and densifier application.
Material cost ($)
Tooling, densifier, dye, and stain guard combined.

How this is calculated

Worked example, using the default values

  1. Identify Input Parameters
    4 parameters
    Floor area (sq ft) = 1000, Aggregate exposure (1-4) = 2, Polish level (1-4) = 3, Dye colors (0-3) = 0 = 5 input(s) provided
  2. Calculate Total project cost
    Total project cost = materialCost + laborCost + equipmentCost
    5340 = $5,340
  3. Calculate Cost per sq ft
    5.34 = $5.34
  4. Calculate Total grinding/polishing passes
    Total grinding/polishing passes = totalGrindPasses + totalPolishPasses
    6 = 6

Engine last updated . Checked against 2 independently-derived tests how we verify calculators.

The questions that sit next to this one — chosen by subject, including calculators filed under a different category.

More in Construction & Building Trades.